Description
Joint between concrete and asphalt is raised fairly significantly here. Specific location is about 100 feet after going through EZ-pass lane towards 495 Northbound from I-90
Joint between concrete and asphalt is raised fairly significantly here. Specific location is about 100 feet after going through EZ-pass lane towards 495 Northbound from I-90
4 Commentaires
Christopher McClure (Utilisateur inscrit)
Chris (Utilisateur inscrit)
Jerome (Utilisateur inscrit)
Depending on the season, the joint from the concrete to the asphalt (after the toll both) can form a sharp step.
Clos a (Invité)